INSTALLATION
INSTALLATION INSTRUCTIONS
20
EXTENDED PLUME
MANAGEMENT INSTALLATION
EXTENDED PLUME MANAGEMENT INSTALLATION
8 718 682 335b (09.2008)
NOTE: to ease assembly of the flue components,
grease seals lightly with the solvent-free grease
supplied.
Check all the seals are seated properly in the
grooves provided and are in good condition.
All flue joints must be sealed to prevent leakage
of condensate and flue products.
1
Remove screws (C) and discard the
complete terminal end (D).
2
Fit the terminal bend (E) to the terminal
outlet and secure reusing screws (C).
3
Rotate terminal bend (E) for angled fluing.
DO NOT rotate the complete flue terminal
assembly.
NOTE: the terminal bend (E) has built-in
stops to limit rotation for horizontal fluing
to allow condensate to run back into the
boiler for safe disposal. Do not force the
bend beyond its limit stops.
All plume management sections must
rise by at least 173mm per metre (10°)
from the terminal to ensure that
condensate flows back into the boiler.
4
Mark, drill (protecting bend (E) from
debris) and fit clamp wall plugs (G).
Screw clamps (F) into wall plugs (G) to
the required distance as shown.
Work from the terminal bend (C) connecting
and clamping to support the weight of the
extensions.
5
Push-fit the extension tubes/bends as
far as possible into the connectors (H),
then withdraw each one by 10mm to allow
for expansion.
6
Align extension clamps (M) in position
as shown and secure with screws (J).
7
Push-fit outlet assembly (L) as far as
possible into the extension tube connector
(H).
Rotate the outlet assembly (L) to the
direction required and secure to the
extension with self-tapping screw (K)
supplied.
E
G
1
E
C
C
D
2
H
M
J
L
K
F
F
G
J
4
4
5
5
6
6
7
M
H
M
10mm
CONNECTORS
CLAMPS
6
5
H
3
65mm
4
F
±80°