Bosch 19/24CBI Instrukcja Obsługi

Przeglądaj online lub pobierz Instrukcja Obsługi dla Grzejniki wodne i kotły Bosch 19/24CBI. Bosch 19/24CBI Technical data Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 44
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
9/14CBi, 14/19CBi, 19/24CBi
WALL MOUNTED BOILERS FOR CENTRAL HEATING
AND INDIRECT SUPPLY OF DOMESTIC HOT WATER
INSTALLATION AND
SERVICING INSTRUCTIONS
This appliance is for use with Natural Gas or LPG (Cat II 2H3P).
9/14CBi GC NUMBER 41 311 50 (N.G.) 9/14CBi GC NUMBER 41 311 51 (LPG)
14/19CBi GC NUMBER 41 311 52 (N.G.) 14/19CBi GC NUMBER 41 311 53 (LPG)
19/24CBi GC NUMBER 41 311 54 (N.G.) 19/24CBi GC NUMBER 41 311 55 (LPG)
APPLIANCE OUTPUTS
IMPORTANT: THESE INSTRUCTIONS APPLY IN THE UK ONLY
AND MUST BE LEFT WITH THE USER OR AT THE GAS METER
Read the instructions before starting work - they have been written to make
the installation easier and prevent hold-ups.
9/14CBi N.G.
Minimum 9.0 kW
Maximum 14.0 kW
9/14CBi LPG
Minimum 10.0 kW
Maximum 14.0 kW
14/19CBi N.G.
Minimum 14.0 kW
Maximum 19.1 kW
14/19CBi LPG
Minimum 14.0 kW
Maximum 19.1 kW
19/24CBi N.G.
Minimum 19.1 kW
Maximum 23.5 kW
19/24CBi LPG
Minimum 19.1 kW
Maximum 23.5 kW
Worcester supports the
Benchmark code of practice
Przeglądanie stron 0
1 2 3 4 5 6 ... 43 44

Podsumowanie treści

Strona 1 - SERVICING INSTRUCTIONS

9/14CBi, 14/19CBi, 19/24CBiWALL MOUNTED BOILERS FOR CENTRAL HEATINGAND INDIRECT SUPPLY OF DOMESTIC HOT WATERINSTALLATION ANDSERVICING INSTRUCTIONSThis

Strona 2 - Contents

The gas supplier must be contacted to check the suitability ofthe appliance for the local gas supply conditions beforeconnecting the appliance. The 19

Strona 3 - Fig. 1. Water flow diagram

11Fig.10. Boiler wiring diagram Flame SenseElectrodeSpark ElectrodeGas ValveAir pressureswitchOverheatThermostatFanControl BoardX1X2X3X4X5X61orange11X

Strona 4 - 3. Technical Data

12Fig.11 . System wiring diagram Control BoardX1Pump LPump NPermanent NPermanent LSwitched L(Boiler Demand)Earth postCable clampOUTSIDE OF BOILERINSID

Strona 5

13Fig. 12a. Boiler Assembly 9/14CBiShown set for Rear Only flue kit1. Inner case2. J bolts and wing nuts (2)3. Combustion chamber cover4.

Strona 6 - 4. Siting The Appliance

141. Inner case2. J bolts and wing nuts (2)3. Combustion chamber cover4. Burner5. Burner fixing screw6. Control knob7. Indicator

Strona 7

NOTE: READ THIS SECTION FULLY BEFORE COMMENCING THEINSTALLATIONTo install a boiler with a rear only flue refer to Section 11.1.To install a boiler wit

Strona 8

1611.1.5 Boiler Preparation(i) Remove the appliance casing by releasing the screw at the centre base. Disconnect the earth connection at the base and

Strona 9 - Radiator Valve - Flow RV

1711. Flue hood2. Fan3. Sensing connection (+)4. Sensing connection (—)5. Top outlet sealing plate6. Fan lead clip7. Fan fixing s

Strona 10 - 9. Gas Supply

11.1.8 Completion of the InstallationCheck that all the gas and water connections have beentightened. Lower the base plate/control panel. Refer to Fi

Strona 11 - Control Board

11.2.5 Flue Preparation(i) Drill the hole for the flue at Ø110mm unless the optional internal fitting kit (WHS part No. 7 716 191 019) is used inwhi

Strona 12 - (BOTTOM CONNECTION)

1.1 Gas Safety (Installation & Use) Regulations 1998.It is the law that all gas appliances are installed by a competentperson in accordance with t

Strona 13

11.2.6 Telescopic Horizontal Flue Kit up to750mm in Length(i) The standard flue can be telescopically adjusted to any length between 42

Strona 14

11.2.9 Vertical Adaptor for Horizontal FluesAn adapter is available for an initial short section of vertical flue.Refer to Fig. 25.Measure and cut th

Strona 15 - Rear Only Flue Kit

11.2.12 Installation of Flue onto Boiler(i) Fit the clamping ring around the flue spigot but leave loose.From the inside push the assembly through th

Strona 16 - Fig. 14b . Rear of casing

Cleansing and Inhibiting a Central HeatingInstallation in compliance with BenchmarkIt is accepted good practice in compliance with BS 7593, Pas 33 and

Strona 17 - + ve pressure tube extension

12.8 Central HeatingCheck that the external controls are calling for heat to the heatingcircuit.Check that all the radiators heat up evenly. If necess

Strona 18 - Centre of boiler

Fan - Horizontal Flue. Remove the combustionchamber cover. Carefully pull off the electrical connections andthe tubes from the air flow detector. Loo

Strona 19 - Fig.20 . Extension Duct

Important: Turn off the gas and electricity supplies and drain,where necessary, before replacing any components.15.1 Always check for gas soundness wh

Strona 20 - Fig. 23. Flue bends

27Fig. 34 . Inner Casing - Gas and Electric Controls. 9/14CBi shown.2311. Inner casing2. J bolts and wing nuts (2)3. Combustion chamber cove

Strona 21 - 11.2.11 Install the Boiler

15.4.1 Gas ValveNOTE: If the left hand clearance is >50mm then the gas valvecan be replaced with the burner and combustion chamber coverin place by

Strona 22 - Flue Turret Kit

15.4.5 Control BoardLower the base plate/control assembly and carefully disconnectthe plug-in connector and all the electrical connections. Refer toFi

Strona 23 - Fig. 31. Gas Valve

working at a gauge pressure of at least 0.35bar above the reliefvalve setting if on a sealed system.Where a storage system will not have a vent to atm

Strona 24 - 13. Instructions To The User

15.4.7 Air Flow SensorRemove the fan as described in 14.3. Unscrew and withdraw,through the fan outlet, the air flow sensor. Refer to Fig .38 and38a.T

Strona 25

15.4.11 Combustion Chamber InsulationThe insulation pads are manufactured from a material inaccordance with COSHH.Remove the casing, inner casing cove

Strona 26 - 15. Replacement Of Parts

These instructions should only be read if converting appliancefrom Natural Gas to LPG or vice versa.Only components supplied by Worcester, Bosch Group

Strona 27 - Controls. 9/14CBi shown

1 E60-473 Burner Assembly NG 9/14CBi 1 8 716 121 773 0Burner Assembly LPG 9/14CBi 1 8 716 103 210 02 E60-474 Burner Assembly NG 14/19, 19/24CBi 1

Strona 28 - 19/24CBi

3418. Operational Flow DiagramMains 230VsupplyBOILERHEATDEMANDPump continuesfor4minutesDEMANDOFFBoiler demandfrom systemjunction boxANDUser controlkno

Strona 29 - 15.4.6 Fan

3519. Fault FindingNOTE: This fault finding information is for guidance only. Worcester, Bosch Group cannot be held responsible for costs incurred byp

Strona 30 - 15.4.10 Air Pressure Switch

36Remove connectorX5 and testresistance betweenthe red and violetcables. Is theresistance between1 kohm and 30 kohm?FAIL POINT ANoYesNOTE: It is norma

Strona 31 - 15.4.12 Heat Exchanger

FAIL POINT CIs the boiler in a very coldenvironmenti.e is the primary watertemperature below 5°C? Boiler is running in'Autofroststat' mode.Y

Strona 32 - 16. Conversion Instructions

FAIL POINT E 'BURNER LOCKOUT'Is the gas supplyconnected and at thecorrect pressure?Remove boiler casing.Reset and restart the boiler. Can a

Strona 33 - 17. Short Parts List

39FAIL POINT FDelivered primary watertemperature always too hot.(Over 85°C)Delivered primary watertemperature appears toolow with control knob set tom

Strona 34 - 18. Operational Flow Diagram

The data plate is fixed to the inner casing cover.43. Technical DataHYDRAULIC RESISTANCEBOILER OUTPUT RESISTANCE MIN. FLOW RATEkW Metres

Strona 36 - FAIL POINT B

CONTROLS To comply with the Building Regulations, each section must have a tick in one or other of the boxesTIME & TEMPERATURE CONTROL TO HEATING

Strona 37 - FAIL POINT D

SERVICE INTERVAL RECORDIt is recommended that your heating system is serviced regularly and that you complete the appropriate Service Interval Record

Strona 39 - FAIL POINT F

This booklet is accurate at the date of printing but will be superseded and should be disregarded if specifications and/or appearances are changed in

Strona 40

5GAS SUPPLY SYSTEM - BASED ON NG (G20)TOTAL LENGTH OF GAS SUPPLY PIPE (COPPER) metres3 6 9 12MAXIMUM GAS DISCHARGE RATE - PRESSUR

Strona 41 - COLLECTIVE MARK

The appliance may be installed in any room subject to therequirements of the current IEE regulations and, in Scotland, therelevant electrical provisio

Strona 42 - SERVICE INTERVAL RECORD

The flue system must be installed following the requirements ofBS5440:1.The standard flue kit length is 425 - 725mm. Extension kits forflues up to 3.0

Strona 43

The system must comply with requirements of BS6798 andBS5449.General:The appliance is only suitable for connection to indirect fullypumped sealed and

Strona 44 - Bosch Group

Heating returnNon returnvalveNon returnvalveHose unionTest cockTemporary hoseStop cockAutoair ventHeating returnStopcockFill pointNon returnvalveMake

Komentarze do niniejszej Instrukcji

Brak uwag