Bosch LTC 1271 Series Dokumentacja Strona 29

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 37
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 28
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with
Installer present, for compliance with
requirements for installation tolerances and
other conditions affecting performance of
intrusion detection.
1. Examine roughing-in for embedded and built-
in anchors to verify actual locations of
intrusion detection connections before
intrusion detection installation.
2. For the record, prepare written report,
endorsed by Installer, listing conditions
detrimental to performance of intrusion
detection.
B. Inspect built-in and cast-in anchor
installations, before installing intrusion
detection, to verify that anchor installations
comply with requirements. Prepare inspection
reports.
1. Remove and replace anchors where inspections
indicate that they do not comply with
requirements. Re-inspect after repairs or
replacements are made.
2. Perform additional inspections to determine
compliance of replaced or additional anchor
installations. Prepare inspection reports.
C. For material whose orientation is critical for
its performance as a ballistic barrier, verify
installation orientation.
D. Proceed with installation only after
unsatisfactory conditions have been corrected.
3.2 WIRING INSTALLATION
A. Wiring Method: Install wiring in Wiremold® metal
raceways except in accessible indoor ceiling
Przeglądanie stron 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 35 36 37

Komentarze do niniejszej Instrukcji

Brak uwag