C. The Contractor must uncover and expose all known
conflicts along the trench route to permit
gradual conduit deviations and realignments.
D. To ascertain that the conduit has been properly
laid, the work will be inspected throughout the
construction period by a representative of the
Bristol Board of Education.
E. All conduits must be sealed, immediately after
installation, to prevent the entrance of gas or
liquid building.
F. Building penetration cores must be temporarily
sealed after drilling to prevent leakage into the
building until conduits are fully installed.
G. Rubber compression conduit plugs, waterplug and B
duct sealers should be used to seal conduits
after all cabling is installed. Rubber
compression plugs are the preferred choice.
H. All conduits shall have a mule tape, with footage
markings, drag line installed. The mule tape is
to remain in all conduit pathways after cable
installation is complete.
I. Building conduit entrance points must be below
grade. Below grade entrance conduits shall be
installed with a minimum drop-away of ¼" for each
2 linear feet, for a minimum distance of 10
linear feet from the building entrance point.
J. Placement Method
1. Width of the trench should be the width of
duct structure plus 6 inches on each side.
2. All conduit that is to be encased in
concrete shall have approximately 1 inch of
clearance between the bottom tier of ducts
and the trench bottom. Concrete will have a
minimum strength of 5,000 P.S.I. @ 28 days.
3. The depth of the trench should be the height
of the conduit structure plus a minimum of
24 inches.